A factory audit for a hotel carpet supplier should answer one question: can this company make the specified products, to the approved samples, in the quantities and sequence the project needs, with the documents the project requires? To answer it, check four areas: documents and certifications, the production floor, project readiness, and social and supply chain compliance. The checklist below sets out what to ask for in each, and what evidence to expect.
A hotel audit differs from a retail sourcing audit because the order is a one time project with a fixed opening date, several constructions in one order, and handover documents that the building owner will keep.
Before the visit
Send the supplier the outline of the project: constructions, approximate area per construction, number of designs and colourways, testing requirements and target delivery window. Ask the supplier to prepare evidence against each item below. An audit against a real project is more useful than a general tour.
Decide whether you will visit in person, use a third party auditor, or run a remote audit by live video. A remote audit can cover documents and a walk through the floor. Colour assessment and hand feel are better judged in person.
Section 1: documents and certifications
| Item | Evidence to ask for |
|---|---|
| Company registration and export history | Registration documents, export records by country |
| Quality management system | ISO 9001 certificate with scope and expiry date |
| Social compliance | Certificates or audit reports, such as SA8000 or a Sedex SMETA audit, with dates |
| Child labour assurance | GoodWeave licence or equivalent, with scope |
| Material certifications | RWS, GOTS or GRS certificates, if the project will make a material claim |
| Supply chain security | C-TPAT status, if shipping to the United States and it is required |
| Testing | Willingness and process to arrange testing to the project's named standard, per order |
For every certificate, check the issuing body, number, expiry date and scope, as set out in our general guide to auditing a rug factory in India, and ask how certified material is kept separate and documented through production. Our guide to supplier certifications for hotel ESG reporting explains which evidence each scheme gives.
Section 2: the production floor
Walk the process in order, from fibre to container, for each construction the project needs.
| Stage | What to look at |
|---|---|
| Yarn | Whether yarn is spun in house or bought, how lots are recorded |
| Dyeing | The lab, recipe records, how a colour from a past order is reproduced |
| Design | Who turns artwork into production designs, and how designs are stored |
| Hand tufting | Frames in use, how designs are transferred to the cloth, supervision |
| Hand knotting and handloom | Looms in use, whether weaving is on site or with contractors |
| Broadloom | The production line for wall to wall carpet, if the project needs it |
| Finishing | Latex, backing, shearing, carving, washing, drying, binding |
| Inspection | In process and final checks, records, what happens to failed pieces |
| Packing and loading | Labelling capability, moisture protection, where containers are loaded |
The general audit guide covers the questions that reveal most on the floor, such as which stages are not done in house and how a bulk piece compares with its sample. For a hotel order, walk the floor once for each construction the project needs, because rugs and broadloom often run on different lines.
Section 3: project readiness
This section is specific to hotel work, and it is often skipped.
- Mixed constructions. Can the supplier make every construction in the order, rugs and broadloom, or will part be subcontracted?
- Sampling. Who makes strike-offs, on which equipment, and are they made on the same lines as bulk?
- Approval records. Is there a sample register with reference numbers and rounds?
- Dye lot control. How are lots tracked, and can each rug be made from a single lot of each colour?
- Phasing. Can the order be split by phase or floor, with partial shipments?
- Labelling. Can rugs be labelled by room number, room type or zone?
- Spare stock. Will spares be made from the same lots and packed separately?
- Documentation. What does the handover pack contain, and in what format?
- Project contact. Who is the single point of contact, and who replaces them when they are away?
- Commercial terms. Minimum order, payment terms and Incoterms offered.
Ask the supplier to describe a project that went wrong and what was changed afterwards. A clear answer shows a working process.
Section 4: people and working conditions
Certificates are a starting point. Observation adds to them.
- Lighting, ventilation and drinking water on the production floor
- Safety equipment in dyeing and finishing, where chemicals and heat are used
- Wage records and how often wages are paid
- Working hours and overtime records
- Age verification procedures
- Grievance procedures and whether workers know them
Red flags
- Certificates without numbers, or with a scope that does not match the site visited
- A visit that skips dyeing, finishing or packing
- Samples made in a different location from bulk production
- No records linking an order to its yarn lots and dye recipes
- Reluctance to name stages that are subcontracted
- Commitments to dates before the specification is fixed
Scoring the audit
A simple score for each section, such as meets, partly meets or does not meet, with notes and evidence, is easier to compare across suppliers than a long narrative. Weight project readiness heavily for hotel work, because a supplier that makes good rugs but cannot label by room, control lots or split deliveries will cause problems on site.
Audit checklist summary
- Project outline sent before the visit
- Certificates checked for number, scope and expiry
- Testing process for the named standard confirmed
- Full process walked for each construction
- In house and subcontracted stages listed
- Bulk piece compared with its sample
- Lot control, labelling and phasing confirmed
- Handover documents agreed
- Working conditions observed
- Findings scored by section
Eastern Mills welcomes buyer visits to its 35 acre site in Bhadohi, which includes a 50,000 square metre main facility and a separate broadloom facility. More than 2,000 people work across yarn spinning, dyeing, hand tufting, hand knotting, handloom weaving, broadloom and finishing. Its certifications are ISO 9001:2015, GoodWeave, Sedex, RWS, GOTS, GRS, SA8000 and C-TPAT. See our manufacturing infrastructure and contract carpets pages, or contact us to arrange a visit or a video audit.
Frequently asked questions
Can a supplier audit be done remotely?
Yes, partly. Documents can be reviewed and the floor walked by live video. Ask for one continuous, unedited walk from yarn to packing.
Should a hotel project use a third party auditor?
For large projects or a new supplier, it is common. A third party auditor can also cover social compliance to a recognised audit standard.
How often should a supplier be audited?
For a one time project, once before the order and again at pre-shipment inspection. For ongoing programmes, many buyers audit annually.
What matters most in a hotel supplier audit?
Whether the supplier can make every construction on the order to the approved samples, and control lots, labelling and phased delivery.